Zhuohang Precision Machining FactoryCNC Precision Milling

Privacy Policy

Zhuohang MES production management dashboard, Dongguan, China

This policy explains what personal data we collect, why we collect it, and the choices you have. It applies to every website operated under the Zhuohang Precision Machining Factory entity listed at the bottom of this page.

1. Who we are

This site is operated by Dongguan Zhuohang Ltd (USCC 91441900MA4UWT6X39, established 2005), located at No. 8, Shuibian Songyuan Road, Hengli Town, Dongguan, Guangdong, China 523470. For any privacy question, write to [email protected] or call +86 13126536955.

2. What we collect and why

We collect only what a quotation or manufacturing conversation requires:

We do not buy personal data, build profiles for advertising, or run third-party advertising trackers on this site.

3. Lawful basis (GDPR)

For visitors in the European Economic Area and the United Kingdom, we process the data above on the following grounds:

4. Your rights

EEA, UK, and Swiss visitors may: access, correct, delete, or port their data; object to or restrict processing; and withdraw consent. To exercise any of these, write to [email protected]. We respond within 30 days and never require you to waive these rights to receive a quote.

5. Data retention

Project files and quotations are kept for the life of the production relationship plus the regulatory retention window (default 7 years for quality and trade records under ISO 9001:2015 and IATF 16949:2016). After that, files are deleted unless you ask us to keep them.

6. International transfer

Your data is processed in China (where the factory is) and may be accessed from your country. Where required, we use Standard Contractual Clauses or equivalent safeguards. Project CAD files are stored on internal systems with restricted access and are not uploaded to public cloud storage.

7. Security

Access to personal and project data is limited to staff with a need to know. Engineering systems run behind a private network; email is the primary channel for buyer-facing communication. We have not suffered a personal-data breach; if one occurs, affected individuals and authorities will be notified within 72 hours per GDPR Art. 33/34.

8. No tracking pixels or remarketing

This site does not embed Facebook Pixel, Google Remarketing, LinkedIn Insight Tag, or similar cross-site trackers. Basic analytics, if enabled, uses privacy-respecting first-party measurement without individual profiling.

9. Children

The service is intended for business buyers. We do not knowingly collect data from anyone under 16. If you believe we have, write to us and we will delete it.

10. Changes to this policy

Material changes are dated in the footer below. We will not narrow the scope of this policy retroactively.

What this shop actually runs

A buyer asking for capability evidence should get a specific answer. The facility behind this guide operates 100+ CNC machines across a 6,800 m2 plant in Dongguan, China, with 100+ staff. The machine list by category:

  • 5-axis machining centres (10+) - Mazak VARIAXIS I-600 (510/910/510 mm travel, 12,000 rpm, 22 kW, 71.6 N·m, 30-tool BT40) and Mazak INTEGREX I-250H S (B-axis 0.0001°, 24 kW, 124 N·m, 38-tool HSK-A63). Applied to compound-angle parts, single-setup multi-face prismatic work, and aerospace fittings where datum transfer loss is unacceptable.
  • 3-axis / 4-axis machining centres (50+) - Brother SPEEDIO S500Z2N / S700Z2N (10,000 rpm, 14/21-tool ATC, 0.7 s tool-to-tool, Z-axis 2.2 G) and Mazak VCE-430A L / VCE-570C L (10,000 rpm, 118 N·m, 24-tool ATC). Applied to prismatic parts, plates, brackets, housings.
  • Swiss-type turning centres (10+) - Citizen Cincom A20-3F7 (Φ20 mm, 10,000 rpm), TSUGAMI B0206-III / B0205-III (Φ20 mm, 0.1 µm), STAR SR-32JII / SR-32J Type N (Φ32 mm, 8,000 rpm). Applied to long, slender rotational parts at ±0.002 mm.
  • CNC turning centres (20+) - HEADMAN T70M/1250 (720 mm swing, 117 mm bore, 3,000 rpm, BMT75 12-station turret). Applied to shafts, bushings, flanges up to ±0.002 mm.
  • Wire EDM (5+) - Sodick AQ535L (550/350/300 mm travel, ±20° taper, 800 kg workpiece). Applied to hardened tool steel, internal splines, sharp internal corners that milling cannot reach.
  • Inspection: Hexagon CMM + 20+ gauges - Hexagon CMM for coordinate measurement, plus vision system, profilometer, hardness tester, coating thickness gauge, XRF for material verification. The 10:1 rule (gauge 10x more accurate than the band) is applied to every feature.
  • Machine highlights - VARIAXIS I-600: one-setup multi-face 5-axis + MAZA-CHECK auto-calibration; INTEGREX I-250H S: DONE-IN-ONE mill-turn, B-axis 0.0001° + Ai thermal shield; SPEEDIO S500Z2N / S700Z2N: Z-axis 2.2 G + 0.7 s ATC; Swiss-type: guide-bush switchable + 0.1 µm resolution.

Tolerance bands held: ±0.003 mm on CNC milling, ±0.002 mm on CNC turning, ±0.002 mm on precision grinding and wire EDM. Capability indices: Ppk >= 1.67 initial on key characteristics; Cpk >= 1.33 ongoing in production.

Certifications: ISO 9001:2015 (116024/A/0001/UK/En), IATF 16949:2016 (131941/A/0001/SM/En, design clause 8.3 excluded - disclosed openly), ISO 14001:2015 (116024/B/0001/UK/En). Certificates are issued to Dongguan Zhuohang Ltd (USCC 91441900MA4UWT6X39, established 2005).

Service area: Austria, Belgium, the Czech Republic, Denmark, France, Germany, Greece, Hungary, Ireland, Italy, the Netherlands, Spain, Sweden and the United Kingdom in Europe; Brazil, Canada, Mexico and the United States in the Americas; China, Israel, Japan, Singapore and Sri Lanka in Asia; Australia and New Zealand in Oceania; and South Africa in Africa. Based in China, serving customers worldwide.

Contact: Felipe Iglesias, [email protected], +86 13126536955.

Standards referenced on this page

  • ASTM A582/A582M-12 — Standard Specification for Free-Machining Stainless Steel Bars
  • ISO 9001 — Quality management systems — Requirements
  • ASTM E8/E8M-21 — Standard Test Methods for Tension Testing of Metallic Materials